Nanlite FL-20G Bowens Fresnel and Barn Doors

Last Updated 5 hours ago

Nanlite FL-20G Fresnel showing its glass front and ribbed focusing barrel

The FL-20G concentrates a Nanlite Bowens-mount spotlight into a variable 10° to 45° beam. Twist the barrel to set the spread, then use the included metal barn doors to trim spill. It suits a hard backlight or a pool on a background when the standard reflector lights too much of the room.

Focus range
10° to 45°
Mount
Bowens
Control
Eight-leaf barn doors

Compatible fixtures

Nanlite names the Forza 300 and 500 II models, FC-300B and FC-500B, and the larger FS-series Bowens heads. The Forza 720B has separate operating guidance. For the compact FM-mount Forza 60 series, Nanlite lists the FL-11.

Key specifications

SpecificationDetails
LensGlass Fresnel with adjustable-length housing
Beam range10° spot to 45° flood
Supplied kitFresnel, removable metal barn doors and padded case
Forza 720BNanlite Japan recommends 70% output or less and ambient temperature at or below 35 °C. Above 70%, its published limit is 12 hours of continuous operation.

Setting focus and cut

AdjustmentWhat changes
Spot towards 10°The central pool gets narrower and brighter. Set the focus on the target before trimming the doors.
Flood towards 45°Use more of the wall or background. Check the edges for spill when broadening a backlight.
Barn doorsRotate and feather the leaves to cut a lens or wall. A separate flag farther from the head gives you more control when the leaf edge is too soft.

On set

For a slash across a background, set the head far enough back to cover the full length, then trim height with opposing leaves. If the brief calls for sharply drawn edges or a window pattern, use the PJ-BM projector and shutters instead.

Rental and used-gear checks

  • Confirm FL-20G on the pull sheet. The smaller FL-11 uses Nanlite’s FM mount.
  • Check the glass, focus travel and door retention. Look for a bent leaf that drifts when the light tilts.
  • For a 720B booking, give the crew the model-specific operating note and confirm the planned output and run time.

Back to contents